Instrument Installation and Debugging Video Guide
Complete installation process and debugging methods
Installation Guide
| Title | Content |
|---|---|
| Presentation | View PPT |
| How to install the arms | |
| How to put the PTFE tube into the dispensing arm-1 | |
| How to put the PTFE tube into the dispensing arm-2 | |
| How to put the PTFE tube into the dispensing arm-3 | |
| Install the side brackets | |
| Tidy up the electric wires of SW board-1 | |
| Tidy up the electric wires of SW board-2 | |
| Tidy up the electric wires of mainboard and motor board-1 | |
| Tidy up the electric wires of mainboard and motor board-2 | |
| Tidy up the gray ribbon cable |
Debugging Guide
| Title | Content |
|---|---|
| Adjust the position of washing arm | |
| Adjust position of clean arm in reaction tray position | |
| Adjust position of dispensing arm in reaction tray | |
| Adjust position of dispensing arm in reagent tray position | |
| Adjust position of dispensing arm in sample position | |
| How to adjust the position of the mixer | |
| How to connect pipeline to washing needles | |
| Liquid level detection checking | |
| Put the silicone hose into PTFE tube | |
| Signal adjustment |
Installation and Commissioning Record Sheet of Fully automatic Biochemical Analyzer 2025.10.21 .docx
https://crm.cdn.effisys.net/upload/2025/10/22/20251022094334A025.docx
lamp replacement and AD& Offset adjustment

https://crm.cdn.effisys.net/upload/2025/10/22/20251022094329A024.docx